EMS for battery storage in Czechia.
Starkonex EMS is developed in Prague. It controls battery storage, solar, heat pumps and EV chargers on Czech sites and holds the limits agreed with the distribution system operator.
What it does on a Czech site.
Export limits from the distributor
When the distributor allows only limited export or none, the EMS holds that limit at the connection point, limits the solar inverters and stores the surplus in the battery.
Reserved capacity
Purchase is kept below the reserved capacity and the main breaker, so peaks from production or charging do not cost extra.
Day-ahead prices
For contracts with spot prices, the plan uses day-ahead prices for the Czech zone: the battery charges in cheap hours and discharges in expensive ones.
Heat pumps and EV chargers
Heat pumps and chargers are part of the same plan, so they run on your own solar when it is available.
Backup during outages
On a site built for island operation, the battery keeps the chosen loads running when the grid goes down.
Developed in Prague
The app is in Czech and the team is in Prague: commissioning, training and support in Czech.
Equipment.
Battery cabinets, PCS, inverters and meters common on C&I sites are supported out of the box, including Gotion battery cabinets, Solis, SolaX and Deye inverters and Eastron meters. A new model is added as a driver without stopping the site.
Questions from site owners in Czechia.
Can the EMS hold zero export for the distributor?
Yes. The export limit is held at the connection point on every cycle, and the solar inverters are limited when the battery cannot take more.
Does it work with spot price contracts?
Yes. The day plan uses day-ahead prices for the Czech zone together with your distribution and other charges.
Is it useful on a fixed tariff?
Yes. Self-consumption, export limits and staying within the reserved capacity bring savings on a fixed tariff too.
What happens without internet?
Control runs on the controller on site, so the plant keeps working. The app shows the last known data until the connection returns.
Who installs it?
Partner installers in Czechia or StarkTech Engineering directly. Commissioning and training are done by our team in Prague.